Friday, 18 March 2011

Emergency video shoot

15/3/11

Today we undertook a final video shoot. We were stuck and unable to fill in a 15 second gap in our video, due to a lack of footage. So we did an emergency session filming at Erith pier.

Here is a shot of our location, the pier faces the river Thames
Here is a picture of the cast moving to the next location in front of the pier
The image shows a boat in the distance and the weather help to add the atmosphere we wanted. The weather was fairly dark, gloomy and foggy so this added to the singers misery.

Thursday, 10 March 2011

Third t-shirt design version 2

To link this design to the other products created I added custom brushes to both the front and back. This is to show the bands logo.

Wednesday, 9 March 2011

Second T-shirt design version 2

I decided to add a custom brush to the back of the t-shirt because it didn't link to the other products. The custom brush and colour scheme were intended to be the band logo, therefore I added the brush so that all the products have the logo

Third video shoot

3/3/11


Today we went to film the last of our footage. This footage was mostly narrative shots, and I took the role of the camera man however I also got my own cameo appearance in the video.

Thursday, 3 March 2011

The Fray Ticket

After the the photo shoot I created another ticket. However this ticket I decide to make specific to the band, this is because my research showed that bands who have done tours tend to have a ticket that has their logo or something relevant to their latest material.


To create the background I used a black rectangle and on a seperate layer I used a custom brush. The side bar was created using a white rectangle and the bar code had been copied from the Internet. The main image is four edited images merged together to create the image seen. 

Monday, 28 February 2011

Third t-shirt

This is the third t-shirt design I have done. Although all designs are similar this so that they all follow the conventions of the band products.
This design has the same template but this time it has an image. The image was edited so that hte green that was behind it was removed and then the image was resized to fit on the t-shirt. However the image didn't properly fit so I used the clone stamp tool to fill in the gaps.

Second video shoot

6/2/11


Today we filmed more of our video, this was necessary because the footage taken before was a poor quality. During the filming I was the cameraman.


 This image I was trying to set up a solo mid shot of the guitarist.


 Here I was filming Kyle walking down an alleyway, this was a slow zoom out which led to mid shot.


 Here was a still shot of the zoom and track.


This shot was during Kyle was singing. To make lip syncing easier we made sure that Kyle had the song to sing along to.


 I used the top of a staircase that was on location to replace the Jib, a piece of equipment we didn't have because it is broken, this allowed us to get a high angle shot.


During the filming of this shot I tried to tell each member were to stand so that each could be seen in the footage.